City Centre Cinema Stockton Hotel Renovation
Stockton
The Cinema and Hotel Restoration epitomizes the meaning of redevelopment.
The project consisted of constructing a new Cinema adjacent to the 105 year old
Stockton Hotel which was being structurally retrofitted and turned into a retail
center and housing project. The Cinema posed its own challenges as the Siegfried Engineering team
replaced a 72" storm main that runs under the building without taking the old main
out of service due to tidal issues. The SEI team also designed a new basement
access parking ramp for the Hotel Project that seamlessly integrates into the
plaza that ties the two projects together.
|
|
|