Siegfried is currently working on a design-build team to prepare the on-site and off-site improvement plans for the new 22,000 SF UC Davis Student Community Center. The project, which sits in the heart of the campus, is seeking LEED Gold certification. Siegfried relocated, extended, and tapped steam, both hot and chilled water, as well as coordinated shut-down design with the campus. Overall, the project proved to have very critical and complicated site logistics with the core of the campus having to be shut down to vehicle access during certain intervals. Storm drainage designs were studied and implemented and techniques such as infiltration were utilized to obtain the desired LEED Gold status for the project.