Palo Alto Reservoir

The project, which is part of the City of Palo Alto's ongoing Emergency Water Supply project, intends to supply water to the City in the event of the reservoir and SFPUC system is shut down. Siegfried, teaming with design builder Camp Dresser and Mckee (CDM), was retained to design and manage the construction of a 2.5 million gallon reservoir, install a new water well, and reconstruct two pumping stations. Siegfried is providing civil engineering, landscape architecture, permitting, surveying, and architectural review board documentation. Siegfried was specifically brought onto the team for our known success with the previous water wells project for the City of Palo Alto and our out-of-the box creative problem solving abilities.